Madrid, Spain

HSR LINK BETWEEN ATOCHA AND CHAMARTÍN STATIONS

Client

ADIF

Year

2008

Construction budget

EUR 285 million

Key facts

7 km double-track urban tunnel, excavated with an 11.5 m diameter TBM, crossing 8 metro lines, 4 existing railway tunnels, and emblematic buildings and structures such as the Puerta de Alcalá. Only high-speed rail tunnel in the world that runs under a major city centre. 9 shafts. 3 emergency exits.

Geology: pre-consolidated sandy Tertiary soils showing a presence of water, alluvial channels and anthropogenic fill.

Services

Preliminary design, detailed design and works supervision.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.