Zaragoza, Spain

MULARROYA DAM

Client

Ebro River Basin Authority.

Year

2024

Construction budget

EUR 195 million.

Key facts

Central clay core rockfill dam, 82.5 m high with 4.7 million m3 in the dam body, granular shell material (transition material) and limestone riprap on both faces, 23.5 m high diversion dam, 13 km transfer tunnel to ensure an 8 m3/s reservoir inflow and 10 km of new roads.

Services

Construction control and supervision, analysis and monitoring of contractor’s QAP, topography control, quantity surveying, technical advisory services, quality control on site and during commissioning, preparation of Emergency Action Plan and first filling plan. 

Environmental construction supervision, including design of the measures to compensate impacts generated on the Natura 2000 Network.
MularroyaFase2_A

Completion of the Mularroya tunnel excavation

The Mularroya Tunnel, 13.3 km long and designed to transfer up to 8 m3/s of water from the River Jalon to the Mularroya reservoir, is...
MULARROYA_NEWS

The Mularroya tunnel faces its final stretch

On 13th March 2023, excavation of the second and final section of the Mularroya tunnel commenced from Paracuellos de la Ribera. The initial 8.2 km...

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.