Peru

LIMA METRO

Client

Consorcio Constructor M2 Lima

Year

2021

Construction budget

EUR 3,900 million

Key facts

New lines 2 and 4 and connecting interchange station.14 km long in total with 14 Cut-and-cover underground stations. Station serving the International Airport. Double-track monotube tunnel.

Geology: submerged Lima gravel. Construction method: multimode TBM (Slurry / EPB) with 10.20 m outer diameter. Stations and shafts with retaining walls.

Services

Detailed design of the infrastructure, M&E and auxiliary works.
PYTHON23

Automation of geotechnical calculations using Python

An important part of infrastructure design (railways, roads, dams, tunnels) involves modelling and calculating the interaction between natural terrain and structures. Currently, due to the...
LIMA_METRO_NEWS

Lima Metro lines 2 and 4

In March 2014, the state-owned company responsible for the management and tender of national infrastructure concessions, PROINVERSIÓN, awarded the construction and 35-year operation contract for...

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.