Mexico

AMISTAD III AND IV WIND FARMS

Client

Enel Green Power

Year

2020

Key facts

Amistad III wind farm: 99 MW and 36 WTGs

Amistad IV wind farm: 150 MW and 57 WTGs

230/34.5 kV air insulated generation substation (AIS), with one line/transformer bay, one 133+133 MVA power transformer and 21 collector lines.

Services

Basic and detailed engineering for the BOP, including design of roads, drainage works, MV collection system and HV infrastructure (transmission lines, wind farm substations and switching substations). BIM 6D methodology, LOD 350.

Construction supervision.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.