Navarra, Spain

ITOIZ HYDROELECTRIC POWER PLANT

Client

Canal de Navarra, S.A. (CANASA)

Year

2011

Construction budget

EUR 15.2 million

Key facts

Hydropower plant with 2 vertical shaft Francis turbines and a combined power rating of 28.6 MW. Gross head of 107.12 m and a 50.6 m minimum head. Design flow of 15 m³/s/turbine. Outdoor steel pipe intake 30 m long with diameter 3100 mm. Transformer substation and 66 kV grid-connection power line 30 km long.

Services

Construction supervision and operation of both the power plant and the Navarre Canal.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.