Bizkaia, Spain

BARAKALDO-ERANDIO MOBILE BRIDGE

Client

Provincial Council of Bizkaia

Year

2025

Construction budget

EUR 25 million

Key facts

Pedestrian and cycling bridge over the estuary of Bilbao, curved and on a slope, favouring sustainable mobility in the Bilbao Metropolitan Area.

The 13-span bridge has a total length of 371 m. Its central 60 m section, and the two 48.5 m adjacent sections, form a movable structure which rotates on two masts to open to allow large boats to pass through.

Services also cover the extension of the Altzaga park, in Erandio, which includes the construction and development of a structure over hanging the estuary, contributing to the regeneration of a new 1,970 m² space next to the walkway. The landing area on the shore of Barakaldo will adapt to the planned urban development in the area.

Services

Construction supervision, construction engineering and inspection services.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.