Madrid and Segovia. Spain

AP-6 TOLL MOTORWAY. SECTION: VALLE DE LOS CAÍDOS INTERCHANGE - SAN RAFAEL

Client

Castellana de Autopistas, S.A.C.E.

Year

2007

Construction budget

EUR 138 million

Key facts

13 km section of road. Addition of a third lane. Expansion of the toll area. Viaducts and bridges.

Third Guadarrama tunnel: 3.2 km long with 14 escape galleries totalling 2,200 m between the 3 tubes. 124 m2 horseshoe cross-section with an equivalent diameter of 6.3 m.

Construction method: New Austrian Method (NATM) by drill-and-blast.

Geology: granites and gneisses.

Services

Preliminary and detailed designs, and construction control and monitoring.

Awards

Special Mention in the Spanish Institution of Civil Engineering Madrid Chapter Awards 2010.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.