River Xingu, Pará, Brazil

BELO MONTE HYDROELECTRIC POWER PLANT

Client

Norte Energia S.A.

Year

2018

Key facts

Hydroelectric power plant with 27 generators. Power: 11,233 MW. The reservoir was created by closing the spillways of 27 dykes totalling 18 km in length and with a structural volume of 30 million m3.

Services

Project and construction management and site supervision.