Botafoc Breakwater, Ibiza Port

Client

Port Authority of the Balearic Islands

Year

2023

Construction budget

EUR 10.9 million

Key facts

Caisson breakwater.

515 m length, 20 m maximum water depth.

20 t cubic protection blocks (4,078 units), 6 t cubic blocks (762 units) and 3 t cubic blocks (9,779 units).

Services

Construction supervision of the protective elements rehabilitation of the breakwater foundations.