Uruguay

BULK TERMINAL IN NUEVA PALMIRA

Client

Corporación Navíos S.A.

Key facts

Two pile-supported wharfs, a 300 m main wharf and a 150 m barge wharf. Rail-mounted shiploader on the main wharf, with a design capacity of 3900 t/h (ore) and 2400 t/h (grain). 7 main conveyor belts plus two connecting to existing infrastructure. Two mineral stockpiles (up to 700,000 t). One rail-mounted stacker reclaimer covering a distance of 425 m.

Services

Supervision and technical assistance (civil works and electromechanical equipment) for the expansion.
PALMIRA1

Expansion of the Corporación Navíos terminal at Nueva Palmira port, Uruguay

Following construction supervision of the expansion works of the Nueva Palmira port terminal, carried out during 2016 and 2017, Corporación Navíos once again relies on...

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.