Zamora. Spain

ESLA CANAL

Client

Duero River Basin Authority, Ministry of Agriculture and Fisheries, Food and the Environment

Key facts

Area: 15,800 ha irrigation area, of which 10,500 ha are irrigated, with a channel network. New main intake structure in the canal. Works to replace the trapezoidal channel with FGRP pipe along 3 km of the canal (1,000 to 500 mm diameter pipe). 7 new lateral intakes for tertiary network and supply to 724 ha. 5 km drainage collector with a 5 m3/s flow. Service road upgrade

Services

Study, diagnosis and proposals. Technical designs. Hydraulic and structural calculations. Hydrology.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.