Guadalajara, Mexico

GUADALAJARA URBAN ELECTRIC TRAIN LINE 4

Client

Sistema de Tren Eléctrico (SITEUR)

Year

2024

Key facts

Comprehensive mobility solution for the southern zone of the Guadalajara metropolitan area (Line 4), which will connect Guadalajara, Tlaquepaque and Tlajomulco de Zúñiga.

Length: main line 21.2 km.

Maximum circulation speed: 80 km/h.

12 pedestrian bridges, 3 vehicle underpasses, 5 vehicle overpasses and 26 hydraulic crossings.

8 passenger stations.

Workshops and maintenance facilities.

Shunting yard.

Services

Design and Construction supervision.
TREN_LIGERO_MEXICO_NEWS

Light electric train in Guadalajara, Mexico, will be operational by the end of 2024

The Urban Electric Train System of the state of Jalisco, SITEUR, is carrying out the construction of the Light Rail Line 4, which will connect...