Extremadura. Spain

HIGH SPEED LINE SECTION FROM PLASENCIA - MÉRIDA

Client

Adif Alta Velocidad

Year

2016

Key facts

Works on the trackbed, assembly systems, track assembly, gauge changeover systems, overhead contact line and systems, substations and transformers, electrical substation connection lines, energy remote control facilities, signalling, interlocking, train protection systems, centralised traffic control, auxiliary protection and safety systems, fixed and mobile telecommunications, GSM-R and public operator infrastructure, impacts and modifications to conventional gauge lines, protection systems and noise barriers. The large 1,488 m viaduc built on the Cañaveral – Embalse de Alcántara subsection has a slender central arch spanning 324 metres across the River Tagus. Once completed, the viaduct will be one of the longest high speed railway viaducts of this type in the world.

Services

Coordinating health and safety during construction and coordination of contractors’ activities. Health and safety study preparation or supervision in the design phase.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.