New high speed line to connect Birmingham with Leeds. Maximum speed of 400 km/hour.

Phase 2b – Lot 3 (Tibshelf — Leeds)

– Total length of 112 km.

– Connections to existing conventional rail network (East and West Coast Main Lines; Northern Powerhouse Rail; Midland Main Line).

– 1 cut-and-cover tunnel

– 1 TBM bored tunnel 1.15 km long with an internal diameter of 7.55 m.

– 3 SCL (Sprayed Concrete Lining) cross passages

Services

Preliminary design and environmental impact assessments

Awards

UK APM Association for Project Management Winner of the Health, Safety, Security & Environment (HSSE) Award for the Healthy by Design programme.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.