Bahía, Pernambuco, Sergipe and Alagoas Divisions. Brazil

SÃO FRANCISCO RIVER TRANSFER

Client

National Electricity Company (ENDE).

Key facts

Irrigation project for an extensive region of north-eastern Brazil affected by persistent droughts that impact on agriculture development. 17 x 6 m high trapezoidal channels totalling 105.4 km, max. flow 99 m³/s and min. flow 89 m³/s. 6 pumping stations, with average pumping flow of 55 m³/s. 5 aqueducts with a total length of 675 m. 5 dams with a total volume of 165.6 hm³. 7 hydropower plants with 209 MW installed power. 2 power transmission lines, 410 km and 100 km respectively, with voltages of 230 kV and 69 kV.

Services

Detailed design and technical construction assistance.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.