Spain

MÁLAGA METRO

Client

Andalusian Regional Government.

Year

2007

Construction budget

EUR 700 million.

Key facts

Lines 1 and 2, section from Guadalmedina-Malagueta including 1.8 km of underground railway with two stations (La Marina and La Malagueta) in cut-and-cover tunnel. Line 3 between La Malagueta and El Palo stations is 5.5 km long and features six stations.

Construction method: cut-and-cover tunnel between retaining walls excavated with a hydromill.

Geology: part of the route crosses rocky areas (shales, phyllites and sandstones) and the rest traverses areas containing soils and marine deposits with a high groundwater level.

Services

Detailed design of L3. Supervision of the detailed designs, and construction supervision and control, of Lines 1 & 2.

Awards

‘Andalusian Engineering Works 2021’ Best Infrastructure Award from the Andalusia, Ceuta and Melilla chapter of the institution of civil engineers.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.